A级毛片18以上观看向日葵视频app_向日葵视频色版app_向日葵视频官网

老师喂我乳我脱她胸罩

 Disinfectant plastic bottle
Product classification
Contact us

Hebei cangde Amperex Technology Limited

Contact: Manager Nie
Mobile phone: 16630772688
Free hotline: 400-6638-958
Tender manager, Nie Manager: 13301356611
Bidding Manager Wang: 18932791777
Fax: 0317-5880268
Address: Zhu Li Kou Industrial Zone, Yun Dong, Cangzhou.

Two problems needing attention in the design of electric boiler boiler room
Your current location: Home Page Two problems needing attention in the design of electric boiler boiler room
Two problems needing attention in the design of electric boiler boiler room
Author: administrator release date: 2016-05-19 09:19:42

 Electric boiler

Electric boiler Two problems to be noticed in boiler house design
1, electric boiler boiler room should pay attention to equipment matching when designing: electric boiler and heat storage pump, circulating pump, replenishment pump and other ancillary equipment are not supplied by the same manufacturer, but supplied by several manufacturers, resulting in a mismatch between the pump control box and the electric boiler control cabinet. According to the control requirements, the electric boiler should be interlocked with the heat storage pump. However, because the control box of the heat storage pump is not considered, this will bring great trouble to the construction and installation. It is hoped that when ordering units or contractors, the auxiliary equipment and control boxes of electric boilers and heat storage pumps, circulating pumps, water replenishing pumps and their control boxes should be supplied by the electric boiler suppliers as far as possible. The control devices of the pumps should be integrated into the electric boiler control cabinet, which is centralized controlled by the computer controller, which is convenient for installation wiring, operation and maintenance, and also reduces the faults and improves the safety and reliability.
2, when designing the boiler, we should pay attention to the design and Perfection: the electrical construction design drawings of the electric boiler boiler room are not complete, and the electrical construction design drawings of the electric boiler boiler room shall include the power system diagram and the power pipeline layout plan. However, due to incomplete information on the design of the electric boiler equipment and the selection of the electric boiler equipment in the design of the construction drawings, the design of the construction drawings can not be made, resulting in the vacancy of the electrical construction design drawings. Although the above problems are only individual phenomena, we hope to draw your attention. With the popularity of the application of electric boilers, the increase of the design of electric boiler boilers and the continuous improvement of the standard standards, it is believed that the electrical design level of the electric boiler boilers will be greatly improved.
 

COPYRIGHT ALL 2014 RESERVED. RIGHT
Address: Zhu Li Kou Industrial Zone, Cangzhou, China. Tel: 13301356611 Fax: 0317-5880268 Mobile: 16630772688
Copyright: Hebei cangde Amperex Technology Limited technical support: Cangzhou show network QQ79471598   Baidu Maps