丝瓜黄瓜视频在线观看视频yy6080新觉世影影院版_6080新视院官网_yy6080新视觉影院

老师喂我乳我脱她胸罩

 Disinfectant plastic bottle
Product classification
Contact us

Hebei cangde Amperex Technology Limited

Contact: Manager Nie
Mobile phone: 16630772688
Free hotline: 400-6638-958
Tender manager, Nie Manager: 13301356611
Bidding Manager Wang: 18932791777
Fax: 0317-5880268
Address: Zhu Li Kou Industrial Zone, Yun Dong, Cangzhou.

Installation of household electric heating equipment
Your current location: Home Page Installation of household electric heating equipment
Installation of household electric heating equipment
Author: administrator release date: 2019-03-05 14:48:06

1. Heating scheme design

Heating design must be included in the overall scope of the design at the beginning of the house decoration. Therefore, the heating designer will carefully communicate with the decorator and the owner about the heating needs of the living rooms, and set up the placement of the radiator (no need for floor heating) with the home design, and propose a scientific and reasonable heating solution.

2. Choose heating products.

Then, the designer will calculate the corresponding energy supply according to the heating scheme and the preferences of the owners, select the heating equipment with energy saving and environmental protection, and determine the most suitable product type and overall system configuration.

3. Water and electricity paving

A large part of the heating decoration is a concealed project. When the water and electricity lines are renovated and pre welded, the roof, wall and ground shall be treated. The installation position of the wall hanging furnace and the relevant heating fittings shall be confirmed to ensure the quality of the construction in the future.

4. Piping laying of heating system

When the heating and power line transformation is coming to an end, laying the heating system pipeline and embedding the heating thermostat line at the same time, requiring every step to strictly slotted and drain the piping according to the design drawings, so as to ensure the heating effect of the whole heating system in the future.

5. Ground heating test and pea leveling.

Carry out the pressure test to ensure that the whole piping system has good tightness. After 24 hours of testing, the pea leveling can be done.

COPYRIGHT ALL 2014 RESERVED. RIGHT
Address: Zhu Li Kou Industrial Zone, Cangzhou, China. Tel: 13301356611 Fax: 0317-5880268 Mobile: 16630772688
Copyright: Hebei cangde Amperex Technology Limited technical support: Cangzhou show network QQ79471598   Baidu Maps